Pants and Lard

Yet another job that was unfinished from the extension, was the pantry (or larder, depending on where you’re from). Part of the old kitchen was now between 2 doors, that were close by. It was a bit of an awkward space, but we figured out early on that it would be really handy to use it as a pantry, to give us additional room to store jars and cans, and even some of the bulkier items that just don’t go anywhere else.

Currently it was just used like a cupboard, so just contained a few bulky items. What we wanted was something that could house a lot of our tins and cans, and all of the nice things we’d made in previous years, like jars of jams and marmalades, and bottles of booze. By shear luck, we managed to find a couple of photos of a similar project someone else had done, that was exactly the kind of thing we were looking to do, in an almost identical space. This made it much easier to understand what we needed to do!

The project got off to a rather slow start. We put this on our list of jobs to do in 2026, with a plan to do it at the start of the year, when we had plenty of spare time to get it done. I worked out some designs, took it to a timber merchant and even got a quote, and was about to pay for it…but mother nature had other ideas (see our Storm Chandra update).

So that meant we needed to wait while we sorted out all of that.

7 Months Later…

Eventually, once we’d sorted out the leak, the mould, and the repainting, the pantry was in a position to be worked on again. We went back to the timber merchant and paid the invoice. During that whole time, the plans I drew up were stuck to the fridge, so we got to look at them everyday, but that was all.

Until we finally got a message to say that the wood was ready to be collected, and we had a week off from work, where we could actually do it.

Something of a theme in these updates is my awful measuring and planning skills. I’ve managed to incorrectly measure and calculate floor tiles, and the amount of fence paint we’d need. And so it shouldn’t be surprising that I managed to get the wood order wrong too!

Mistake #1: I managed to get the length of one of the shelves wrong. And this was because at the last minute, I changed the depth of the back shelves by 100mm but forgot to shrink the side shelves by the same amount. And I got the length of the wall batons wrong, as I didn’t take into consideration the overlap in the corners.
These mistakes weren’t so bad, as they could be fixed by cutting the wood down. Unfortunately we didn’t have the tools for that, so we had to take a late night drive down to Plymouth to borrow a mitre saw, so that we could get started the next day and start cutting things down.
And because the wood we used was quite hard, we did try to buy a nice new saw blade, so that we could get a nice clean edge on it, but despite trying for an hour to get the new blade to fit on the saw, it just didn’t want to know, so we gave up on that!

Mistake #2: For some reason I’d not requested enough batons for a couple of the shelves. I have no idea why I did this. It was a simple case of having 4 shelves and so needing 4 batons, but I only asked for 2. No reason to do that, but I did. By sheer luck, the timber merchant gave us a couple of left over cuts, that were close in width (but not exactly the same) as what we needed. So we used the mitre saw to create a couple of make-shift batons.

Mistake #3: I ordered too few brackets. Not sure why. I probably just counted them wrong.

What’s frustrating is that I could have used that 7 month gap to do a check on all of the measurements and my counts. Coming back after all that time would have meant I had a fresh pair of eyes and could have spotted my mistakes, but I didn’t. I was far too focussed on getting the wood in time for our week off, so we could get it done. More haste, less speed.

When Life Gives You Labels

Encouraged to not make any more mistakes, and seeing how many pieces we had, I could immediately see an error trap where it was going to be very easy to mix up some of the pieces, and if I cut the wrong notch out of the wrong piece, or measure a piece in one location, but then use it in another, then there would be a good chance of it not all fitting together, and might even mean we’d need to reorder some of the pieces. Since it was already expensive wood, I was keen to lot let this happen. So I started the project by making a number of labels for each piece, so I could distinguish between each one, and the label also helped me to remember which way each pieces should be orientated.

This probably was the most useful thing that I did. It saved me so much time over the week, and meant I didn’t have to keep double-checking everything. And it was much easier to be able to ask for a specific piece by name when we were working together.

So after using the first day to collect the wood and the right tools, we used the second day to get the wood ready. This did take a while, but I was trying to be accurate and not rush through it and make more mistakes.
This day also coincided with the landscaper coming and doing a bit of work in the garden, which was lucky as he apparently had the same mitre saw as the one we borrowed, and so knew how to work it, which I did not.

At the same time, we thought it would probably be a good idea to apply some kind of varnish to the shelves. Despite buying particularly hard-wearing wood, we knew they were going to take a bit of a beating over the years, and maybe even the odd spill, so some sort of extra protection, might be a good idea.
We’d use Osmo Oil before, and still had some left over, so we used that. The only annoying thing was that each piece then needed 24Hrs to dry. Lucky the rest of the project was going pretty slow, so this wasn’t a problem.

So once I knew what I needed to do, I got all of the pieces ready, and by day 3, we got the batons on the wall.

Frickin’ Laser Beams

Putting up shelving was also the perfect opportunity to use a new laser level that I recently purchased that made it easy to mark up levels lines the whole way around the pantry. Unfortunately I didn’t have the best tools for cutting out the notches in the shelves, so some of those were a bit uneven, and messy.

But with a little bit of luck, we managed to get all of the shelves to fit together.

One important thing for me was the ability to fit 2 cans on top of each other on the shelves. It wasn’t essential, but when I worked out the plan, I was kind of limited by the space that was available. The slope at the back meant I couldn’t go any higher, and there was some trunking in the middle which we had to work around as well. This meant we had a specific gap to work with, and a if we put in 2 shelves in-between, each should be just big enough to allow for 2 tins to be stacked. But it was close.
I didn’t want to end up with a shelves that were slightly too small, because it would be a waste of space. So I was glad when we tested it and found that 2 would fit. Although I didn’t take into account the extra few millimetres on the brackets, so they 2 won’t fit everywhere.

On the forth day, I was able to get all of the brackets on (that we had), removed all of the stickers, screwed in the shelves to the batons, and then cleaned up all the mess, so we could finally start putting some items on the shelves and using the pantry as we’d originally planned.

Wild Wild West

2026 started off with a low note. We had a beautiful New Year’s Day, followed by several weeks of non-stop rain, including a few named storms. And one of those storms, called Chandra, hit on the 26th Jan.
And after seeing rain constantly all day and all night, we woke up to find some damp patches on one of the walls, so apparently there was a leak somewhere.

The patches were a bit random, so we couldn’t be sure where that leak was coming from. There was nothing obvious outside, like any missing roof tiles, but there was plenty of evidence of how extreme the weather had been. And the attic did show evidence that the leak may have been going on for a while.

And more importantly, the leak also found it’s way down to the newly built pantry. The timing was actually pretty lousy (or lucky, depending on your philosophical outlook) because we had just been to the local carpenter, in readiness to order some wood to build our pantry shelving. And the day before this happened, I’d received the confirmation email, with a link to pay for it. So obviously that particular job had to take a short break until later in the year.

Eventually the constant downpours did subside and the patches stopped expanding, and even dried out. What was left were patches of peeling paint and stained paint.
We decided it was best to give these some time to really dry out before looking to fix the patches, but in the meantime we’d contact some roofers to see if they can come out and figure out what’s wrong. Unfortunately, following a very storming few months, roofers were in high demand, so even trying to get hold of one turned out to be a tall ask. After a few weeks we hadn’t heard back from anyone.
Luckily for us, our neighbours directly opposite, were having some work done to a small bit of roofing, and so I contacted the number on their van to see if they were able to come and have a look while they were in the area. And they thankfully obliged.

Mind the Gap

The roofer popped over (after he’d finished his actual job) and pulled out an extremely long ladder, so he could get up and have a look for any damage. As expected, there wasn’t anything significant, but there were a log of small gaps in the old mortar, that rain could easily makes it’s way into. Especially if that rain was constant for a long period of time.

Fortunately that also meant that for just a few hundred quid, he could come and fill in those gaps, waterproof the area, and add a cowl, to minimise any future of water ingress. And after a few weeks, the scaffolding was erected, and then a few weeks after that they came and did the repairs.

This was also at the same time the landscapers started working on the back garden, and the same time as discovering that there was a problem with the new kitchen drains.

Ignoring those other job, all we needed to do now, was to sort out the peeling paint inside.

Climate Breakdown to the Rescue

We had to be sure that everything was dried out before we could try and repair anything at all, so we were hoping that once spring was out of the way, we’d get a nice spell of warm and dry weather to make sure everything was back to normal.
And the weather delivered! Summer 2026 turned out to be the hottest on record. So after the 5th heatwave, and experiencing twenty one consecutive days of maximum temperatures 25°C and higher, the house had been properly baked in the summer sun, and we thought it was probably a good time to finally repair the paint.

We also decided that if we were going to have to repaint the hallway and stairs, that we might also go for a new colour too. We originally just did a pure brilliant white, to make things easy. But first we needed to scrape of the paint that was flaking and peeling.

This didn’t seem too bad, but it was one of those jobs where you start peeling and suddenly a lot more comes off than you were expecting, and then as you try and make sure you’ve got every loose bit, the scraper gets another part and peels off yet more.
Undeterred by this, we were keen to get every last bit of loose paint off. And we then treated it with some Zinsser Peel Stop, to try and make sure there was no chance of any more coming off.

It did technically work, but as we went over a couple of patches with the new paint and a roller, it did manage to lift some more flakes off. But these were all areas that we hadn’t scraped beforehand, so the Peel Stop did it’s job, these were areas we hadn’t been treated, because we couldn’t see that they were there. So a second round of scraping, treating, and painting, did the trick.

And luckily the new paint even managed to make the walls look a bit more smooth and even too, so we’re happy with. Let’s see what Winter 26/27 has in store for us.

Phase 2: The Extension Strikes Back

Over the 2025/26 winter season, we started having a small issue with our kitchen sink. It was running very slowly, and a couple of times had to be plunged to get it running again. Nothing serious, but considering it was a brand new sink, in a brand new kitchen, with brand new plumbing, it did seem a little strange. Especially considered how meticulous we are about not letting grease go anywhere near the plug.

But we didn’t think much of it, until one morning when we were outside the back door, and noticed that grey cloudy water was coming out of the rainwater drain. And we could see evidence that this had previously been over-flowing.

This was very confusing. Because the drainage plans were specifically set out to keep grey water and rain water separate. It was part of the agreement with Southwest Water when the original drain was moved in preparation for the extension foundations. And we had a soak-away put in to take the rainwater into the garden. So waste water coming up through one of these drain didn’t make a lot of sense.

And even after some chemical treatment and a good poke with a long stick, we were all out of good ideas.

Back to the Drawing Board

Something did come to mind though. So when we decided to split the extension into 2 phases, we had to put a drain into the concrete foundations, in readiness for when the new sink and dishwasher would need to plumbed in, but also as an a drain to allow rainwater to drain off.

These are 2 different things, which needed to be treated separately, as per Southwest Water’s instructions. But, the simple answer was that we’d use the drain for rainwater in phase 1, but get the connection to the sewer all ready to then swap the connection over to waste water for phase 2. Simple, right?

So simple, that we had assumed that it all happened when phase 2 was being built. However, the only thing we could think of that would explain why waste water was backing up out of the rainwater drains, is that this wasn’t done. But that’s not a simple fix. So we dropped the builder a line.

At first he was adamant that what we were seeing, couldn’t possibly happen. Then he asked us to test a bunch of things, which we did, including purchasing some manhole cover keys, so we could lift it and see what was happening with the waste water from all different parts of the house.
Everything else seemed to be working as it should, just not the kitchen. And when I asked the builder if he could think of any way that this might happen, he had a brainwave. And it was exactly the same thing that we thought of.

Luckily he was working on a property nearby, and so got one of his team to pop around first thing on Monday to take a look and figure out what they can do to fix it. And even luckier, the landscaper who was due to install some decking over this area, and fix the nearby wall, was scheduled to start the next week, so the builders had a short window to get in, fix it, and get out.
In the mean time, we purchased a tiny dirty water pump, so we could drop it into the exposed drain and pump out as much water as possible. It was slow, and because it was grey water it kept getting jammed, but eventually we managed to get a decent amount out and into the actual sewer.

And the next day, the builder came around and started to dig out the surrounding area. And as we all expected, the rainwater, and the kitchen waste were both going into the same pipe

So for about 18 months, all of our kitchen waste water, from the sink and the dishwasher, had been routed into our garden soak away, rather than down in the sewer for Southwest Water to treat.

The builder didn’t hang around, and ripped the old connection out of the ground and put the new ones in. So now the kitchen waste was connected to the sewer, and the rain water run off, now went to the soak away.

What remains, looks a bit like one of those complicated junctions you see on the London Underground, but it works, and it would all be buried again, and then decking would be going over the top of it, so we were just happy to have a kitchen sink that works properly again.

During the works, our elderly cat, Charlie, had his normal route to his catflap blocked and so he used his remaining braincell to traverse over this wet and stinky mountain of mud (instead of taking the very clean route around it).

Because the mud was created with waste water, rather than clean, it was extra sticky and smelled pretty awful, and so made Charlie very muddy and stinky too. And even after a quick rinse in the sink, he was still too smelly and muddy to let wander around the house, so Charlie got to experience his first shower. To make things even more fun that shower coincided with an ill-timed powercut, so it turned out to be a much darker and colder shower than planned (but Kate, who was in the shower with him, managed to mostly stay calm and keep Charlie warm). Regardless, it wasn’t an experience Charlie was keen on, and luckily the mud was all cleared up the next day!