Phase 2: Can the Real Extension Please Stand up? (part ii)

Now that the external work had been done and we were properly sealed up (see part 1) work on the inside could begin.

Working 9-5

As exciting as it is for internal works to begin, this work meant that we couldn’t work from home any more because they would have to start drilling through to the exact spot where I worked, and they going to start making a lot of noise and mess.
So from mid-April, we had to get back in the routine of waking up earlier and heading in to the office again. Not a lot of fun, especially when we’d gotten used to working from home since lockdown, but there was no other choice.

It also meant that we were living in a building site, where we were surrounded by lots of junk that could no longer go where it was supposed to go, and absolutely everything was covered in brick dust. Brick dust that we still occasionally find, years later.

This bit got very tiring, very quickly.

Out with the old

First up was the bathroom. And this bathroom should have been removed a long time ago, but we were always waiting for this point, so that we didn’t end up replacing a bathroom twice.

With the toilet and shower gone, it was not looking good for us to stay in the house, but by sheer luck (not really cos we kind of planned it) we have another toilet and shower downstairs, that the builders had installed as part of the utility room improvements back in Phase 1.
It’s not ideal having to use the shower all the way downstairs, and going back to having one toilet, but we had actually been using the downstairs shower since it was installed, because it was so much better than the old electric one upstairs, so it wasn’t too much of a change.

And now that we’re looking at the inside work, all of the diagrams and documents that we got from the architect suddenly became incredibly useful. We had to tweak one or two of them after there had been a couple of changes, but nothing major.

Break on Through

Now it was time to get serious, with the bathroom completely gone, the builders could start knocking the old external walls down to join the old and new together. Even the kitchen had to be mostly removed too, but suddenly the space opened up and you could see just how much of a difference the extension was going to make.

And it was quite therapeutic seeing so much crap being thrown out, including an oven that was most likely older than either of us, which we also found out had been slowly scorching the wall behind the oven every time we, and possibly the previous occupiers, had used it.

It was even interesting to see other things that we wouldn’t normally get to see, like above the ceilings, or being able to see the new bathroom from the back bedroom. And in May, we finally got to see how the house originally looked with the door between the kitchen and the hallway re-instated.

Kitchenette

Whilst we had the toilet and shower to fall back on, we hadn’t had the opportunity to install a back up kitchen anywhere. This meant the builders had to provide us with a ‘Plan B’, which basically involved keeping the sink from the old kitchen. We’d managed to find a little bit of room for the microwave and an air fryer, but that was about it. Luckily our fridge had been situated in the dining room before the extension, because the kitchen was never big enough for it, and so we were able to leave that where it was.
But it was pretty basic, and you quickly get tired of having to brush your teeth in the middle of the kitchen, and living off of a lot of ready meals, every day. Although I did start making use of the Too Good To Go app over this period, which I usually enjoyed.

Despite it feeling like we were in something of a Groundhog Day, the builders were making some decent progress. Some of it felt pretty destructive, more than constructive, but it was all part of the process.

I Love it When a Plan Comes Together

By the end of May, we were starting to see some of the final parts coming together and yet more of the outside jobs were getting fished too, making it feel like we were really getting close.

If I am honest, this couldn’t come quickly enough. Between working at the office, the lack of kitchen, and having to spend almost every weekend, sourcing tiles, or trims, or paint colours, or cupboard handles, or grout, or flooring, or wood, it was getting to be a bit of a slog.
We even missed the northern lights, that were visible in August 2024 (extremely rare event for our part of the world), just because we knew we had to get up early the next morning and out to some suppliers.

But there was more progress with the underfloor heating installed, and flooring down. A brand new boiler, and even some tiles (which may have annoyed the builder a little bit because we picked the most awkward way to have them laid out), but we could almost see the finish line.

But that bathroom was getting a lot closer. With the tiling being completed, and the paint on the walls. We even had the radiators, and shower and bath plumbed in. The sink and toilet were no longer just theoretical, and we had power.

Then came a really big part of the jigsaw, the new kitchen, which was delivered in late June. Even before we were stuck with just a sink, the kitchen had always been one of those areas that caused us so many headaches. It was really the biggest driver for getting the extension in the first place, as there was just no way to make use of the space that was there. So it was a massive thing to finally see a new kitchen being built in our house.

We had a few issues with a missing oven, and then 2 being delivered at once, but it got sorted eventually. And it felt even more real when some of the finishing touches started going in, like the tiling, and a new sink (that isn’t just floating in the middle of the floor).

We still had the old sink while the new kitchen was going in as we didn’t have a fully completed bathroom just yet, but the builder knew this couldn’t stay, so they finished the bathroom off, and cleared everything out, so we could start making use of it while the rest of the work could keep going.

Side Quest

We found out about a little known issue when buying tiles from some suppliers, which is that if you want to return any excess tiles, you can’t just take them back to the shop that you bought them from, you have to return them to the factory. In Wales. Yourself. Between 09:30-12:00. And pay for the privilege!
So early one Saturday, at the end of July, we loaded up our particularly small car with the tiles we no longer needed, and took a drive to Monmouth. Luckily, it was a nice summer day, and we used it as an opportunity to visit Tintern Abbey, which we’d not heard of before but happened to drive past on the way, and we headed over to Bristol for some lunch at The Bank Tavern, and had some extremely delicious food.

We also had some issues with some lights, where we were not happy with the quality. Thankfully we didn’t have to return these ourselves, as they came from China. It was frustrating that we couldn’t get these anywhere else, so we had to settle on a different option.

Happy Endings

After a few too many weeks, and months, of not having a house we could actually use, and finding brick dust on every possible surface and in places dust shouldn’t be able to reach, we we able to start cleaning up and properly moving in to our lovely new home, around the end of August.

Despite the fact that it felt like a long time (7 months in total), I have now seen other projects going on nearby and it seems that this was actually quite quick. Maybe that was helped by the fact that some works were done in earlier phases, in which case I am really glad that we did it like that.

Transformation: The Master Bedroom

When we thought back to the start of the decorating process for the bedroom, we realised that it had actually taken us a year, from start to finish. We’ve been sleeping in the back bedroom during this period, which is smaller and quite cramped. So it makes moving back into the main bedroom feel like it’s a lot bigger!

The thought depressed us a bit, as throughout the process we seemed to be constantly chasing people up, doing our bit relatively quickly then chasing even more people up. I think in the future we’re going to have to learn to stop chasing people and just find someone who actually wants the work (alternatively we could just try and do it all ourselves, save the electrical, to speed up the process).

Yet, through all of the problems we’ve had, we’ve managed to complete another room and I’m pretty pleased with the results:


Long before we began any decorating, we hired an electrician to install some more sockets in the room, as we only had one near the door to begin with. The new ones we put in were supposed to be positioned for the bed, but we changed the layout in the end, so it was a bit of a waste. A replacement radiator was also put in as when we went on holiday we came back to a big leak in that room. We also had the window replaced not long after we’d moved into the house.  We had the issue, as we’ve had with all windows in our house, that it left the cavity exposed and we had a builder bolster our the plaster and put in some plasterboard to cover the gap. The end result looks good.

Next we stripped off all of the old wallpaper which was surprisingly (and suspiciously) easy to do in this room, when it came off in big chunks. Then Paul had fun ripping out the built in wardrobe.

As we took the wallpaper off, we discovered that there used to be a fireplace in our room, so I changed the plans and delayed things further by deciding that it would be nice to put one back in.

We used a local company, who we’ve used for a few jobs around the house to put in the fireplace. We reduced costs by buying a second hand, replica Victorian fireplace from a vintage furniture shop for around £50 including an old bit of slate for a hearth.

We hired a new plasterer, as the one we used previously wasn’t responding to any calls or texts from us. The new plasterer was more expensive but in fairness, I felt he did a bit of a better job too.

We’ve decided to paint the walls white, because Paul has some sort of aversion to colour. I agreed as long as I’m allowed to accessorise with colour instead, this has yet to happen, as we’ve run out of our home improvement fund at the moment and want to save up again. But we’re looking for bits and pieces.

We had some shelves and a cupboard put into the alcove where the wardrobe was ripped from. And again, we used a different carpenter from before, because he also stopped replying to us. So it was carried out by the same company we used for the fireplace.

We weren’t sure how best to give the details to the carpenter, so we asked for specific gaps between the shelves by using masking tape, and left a picture from Pinterest, as reference

Once the shelf was built for us, which only took two days, we primed and painted it all, along with the skirting board. Finally seeing the shelving all done really felt like the room was coming together and like we were approaching the end.

On the 3rd May we finally had some thick, luxurious carpet put in, bought from the same local shop which gave us a good deal on the one we had put in the study. This time, we chose one of the most expensive, luxurious carpets and it was most definitely worth it. It was £29 per sq meter but we supplied our own underlay as I could get it discounted from work.

We were able to take the carpet samples home with us and were glad that we did as they looked lighter in our house than they did in the shop. We chose a shade called ‘shadow’ from a range called Merion Luxury by Lifestyle Floors. It is fantastically soft, and feels so nice under foot. Especially compared to the awfully thin carpet that used to be there.

You can really sink your fingers into it

In fact, when the carpet fitters came to actually replace the old carpet, we actually discovered that the thickness of just the new underlay was more than the old underlay and carpet put together, as the door now scraped across the top of it. That meant that we had to take the door off completely to get the new carpet in. And rather than just planing off a bit from that door, we had to saw a good chunk of it off the bottom, and try and put it back together again! Thankfully it worked and now opens nice and quietly.

We were all ready to move back in when we suddenly remembered that we didn’t have any curtains in there. So we had a couple companies come around and quote for fitting blinds, after several companies ignored our initial requests.

We think the moral from doing this room, is making sure that you get good workmen who actually respond to you. If they don’t reply, don’t waste your time with them.

One blinds company was significantly more expensive than the other, but even the cheaper one was more than twice the price of the exact same blinds online. So in the end, with our savings getting close to disappearing, we didn’t go with either and instead opted at fit them ourselves.

We ordered the ‘Great white’ range from Web-blinds, after I ordered a few free samples from them to begin with. One arrived very dented and I was not particularly happy about it but having it replaced would have delayed our moving back into the bedroom, so we just went ahead and fitted it anyway. It was relatively easy, and for the amount of money we saved, definitely worth it.

I emailed Web-blinds about the dent and asked if we had any issues with it, would they be able to replace it, and they were absolutely brilliant. They said to fit it for now, and they would send a new one without needing the old one to be sent back. They suggested donating the dented one to a charity shop or giving it away to someone who would use it. And the replacement blind arrived within a week and was in perfect condition.

After measuring the back bedroom window, we’ve decided that its roughly the same size as the front bedroom (another benefit of council houses) and that we should be able to use the dented one there instead, preserving a bit of our savings. The valance covers the dent mostly, but you can still see it when you’re stood beside the window, but we can live with it. I’m really happy with the blinds though and they do look good, though we do also need to invest in some curtains too, in the future. The rooms is still a bit echo-y without much in it at the moment, but hopefully that will change as start to fill it out.

We also finally fitted a set of blinds in the study too, which are exactly the same as the ones in the bedroom and were ordered at the same time. And whilst we were at it, we also put up a framed picture that my parents got me for my birthday last month.

New blinds, new picture

A post shared by Kate Best (@caddiebest) on