Phase 2: Can the Real Extension Please Stand up? (part ii)

Now that the external work had been done and we were properly sealed up (see part 1) work on the inside could begin.

Working 9-5

As exciting as it is for internal works to begin, this work meant that we couldn’t work from home any more because they would have to start drilling through to the exact spot where I worked, and they going to start making a lot of noise and mess.
So from mid-April, we had to get back in the routine of waking up earlier and heading in to the office again. Not a lot of fun, especially when we’d gotten used to working from home since lockdown, but there was no other choice.

It also meant that we were living in a building site, where we were surrounded by lots of junk that could no longer go where it was supposed to go, and absolutely everything was covered in brick dust. Brick dust that we still occasionally find, years later.

This bit got very tiring, very quickly.

Out with the old

First up was the bathroom. And this bathroom should have been removed a long time ago, but we were always waiting for this point, so that we didn’t end up replacing a bathroom twice.

With the toilet and shower gone, it was not looking good for us to stay in the house, but by sheer luck (not really cos we kind of planned it) we have another toilet and shower downstairs, that the builders had installed as part of the utility room improvements back in Phase 1.
It’s not ideal having to use the shower all the way downstairs, and going back to having one toilet, but we had actually been using the downstairs shower since it was installed, because it was so much better than the old electric one upstairs, so it wasn’t too much of a change.

And now that we’re looking at the inside work, all of the diagrams and documents that we got from the architect suddenly became incredibly useful. We had to tweak one or two of them after there had been a couple of changes, but nothing major.

Break on Through

Now it was time to get serious, with the bathroom completely gone, the builders could start knocking the old external walls down to join the old and new together. Even the kitchen had to be mostly removed too, but suddenly the space opened up and you could see just how much of a difference the extension was going to make.

And it was quite therapeutic seeing so much crap being thrown out, including an oven that was most likely older than either of us, which we also found out had been slowly scorching the wall behind the oven every time we, and possibly the previous occupiers, had used it.

It was even interesting to see other things that we wouldn’t normally get to see, like above the ceilings, or being able to see the new bathroom from the back bedroom. And in May, we finally got to see how the house originally looked with the door between the kitchen and the hallway re-instated.

Kitchenette

Whilst we had the toilet and shower to fall back on, we hadn’t had the opportunity to install a back up kitchen anywhere. This meant the builders had to provide us with a ‘Plan B’, which basically involved keeping the sink from the old kitchen. We’d managed to find a little bit of room for the microwave and an air fryer, but that was about it. Luckily our fridge had been situated in the dining room before the extension, because the kitchen was never big enough for it, and so we were able to leave that where it was.
But it was pretty basic, and you quickly get tired of having to brush your teeth in the middle of the kitchen, and living off of a lot of ready meals, every day. Although I did start making use of the Too Good To Go app over this period, which I usually enjoyed.

Despite it feeling like we were in something of a Groundhog Day, the builders were making some decent progress. Some of it felt pretty destructive, more than constructive, but it was all part of the process.

I Love it When a Plan Comes Together

By the end of May, we were starting to see some of the final parts coming together and yet more of the outside jobs were getting fished too, making it feel like we were really getting close.

If I am honest, this couldn’t come quickly enough. Between working at the office, the lack of kitchen, and having to spend almost every weekend, sourcing tiles, or trims, or paint colours, or cupboard handles, or grout, or flooring, or wood, it was getting to be a bit of a slog.
We even missed the northern lights, that were visible in August 2024 (extremely rare event for our part of the world), just because we knew we had to get up early the next morning and out to some suppliers.

But there was more progress with the underfloor heating installed, and flooring down. A brand new boiler, and even some tiles (which may have annoyed the builder a little bit because we picked the most awkward way to have them laid out), but we could almost see the finish line.

But that bathroom was getting a lot closer. With the tiling being completed, and the paint on the walls. We even had the radiators, and shower and bath plumbed in. The sink and toilet were no longer just theoretical, and we had power.

Then came a really big part of the jigsaw, the new kitchen, which was delivered in late June. Even before we were stuck with just a sink, the kitchen had always been one of those areas that caused us so many headaches. It was really the biggest driver for getting the extension in the first place, as there was just no way to make use of the space that was there. So it was a massive thing to finally see a new kitchen being built in our house.

We had a few issues with a missing oven, and then 2 being delivered at once, but it got sorted eventually. And it felt even more real when some of the finishing touches started going in, like the tiling, and a new sink (that isn’t just floating in the middle of the floor).

We still had the old sink while the new kitchen was going in as we didn’t have a fully completed bathroom just yet, but the builder knew this couldn’t stay, so they finished the bathroom off, and cleared everything out, so we could start making use of it while the rest of the work could keep going.

Side Quest

We found out about a little known issue when buying tiles from some suppliers, which is that if you want to return any excess tiles, you can’t just take them back to the shop that you bought them from, you have to return them to the factory. In Wales. Yourself. Between 09:30-12:00. And pay for the privilege!
So early one Saturday, at the end of July, we loaded up our particularly small car with the tiles we no longer needed, and took a drive to Monmouth. Luckily, it was a nice summer day, and we used it as an opportunity to visit Tintern Abbey, which we’d not heard of before but happened to drive past on the way, and we headed over to Bristol for some lunch at The Bank Tavern, and had some extremely delicious food.

We also had some issues with some lights, where we were not happy with the quality. Thankfully we didn’t have to return these ourselves, as they came from China. It was frustrating that we couldn’t get these anywhere else, so we had to settle on a different option.

Happy Endings

After a few too many weeks, and months, of not having a house we could actually use, and finding brick dust on every possible surface and in places dust shouldn’t be able to reach, we we able to start cleaning up and properly moving in to our lovely new home, around the end of August.

Despite the fact that it felt like a long time (7 months in total), I have now seen other projects going on nearby and it seems that this was actually quite quick. Maybe that was helped by the fact that some works were done in earlier phases, in which case I am really glad that we did it like that.

Phase 2: Can the Real Extension Please Stand Up? (part 1)

So, we’d finally got the utility room into a useable state, laid the base for the extension, and we’ve sorted out the awful hallway. So it was probably time for the actually extension to be done. And in February 2024, builders came to the house and started turning the garden in to our very own builders merchant, with the builders very own shed. And, most importantly, we gave them their own tea making station, with biscuits, so they could eat and drink as much as they liked.

The plan here was to do to all of the external works, and get it all sealed up, before knocking through the old external walls to connect the old and the new parts together. This part was kind of okay, because we still had access to all of the original parts of the house, like the kitchen, and I was still able to set up my ‘work from home’ station, although it was a bit noisy being right next to all of the work.

Just another brick…

Because of the classic British weather, the first few month of 2024 turned out to be very wet. With hindsight, we now know that this was pretty normal for the southwest, in winter, when the global climate is in breakdown. But it did slow this whole section down, and pushed everything back by a good few weeks. I remember builders going on to the local news and saying how they hadn’t been able to do any building works because the weather had been so bad, and if it didn’t change soon, they would start getting into financial hardship. So I was grateful that our builders had managed to get anything done at all.

And slowly but surely, the walls did go up. And even the Building Inspector was impressed with the workmanship, so we were feeling good about the progress.

And as the walls grew, and February turned into March, it was time for some scaffolding to go up as well, and the steel beams to be added in.

I would be lying if I said the scaffolding wasn’t my favourite bit, cos I really enjoyed going up on the scaffolding and taking in the views (when the weather was decent).

The weather was still pretty awful most of the time, and so the back garden was getting muddy and difficult to traverse. But the builders kept at it and more bits came together. Whenever there was a good weather day, I would try and pop out and get some shots.

Levelling Up

Thankfully spring was getting closer, although winter was refusing to let go. But we got up to the second level, and it was amazing how fast it felt like things were going. We could see the shape of the extension all coming together, so there couldn’t be much longer left, right?

…maybe not.

But we had reached the roof already. And as we were now into April, we had some blue skies, so it’s the perfect time to take off some roof tiles and put the new roof on…except the weather had other ideas and despite the builders best efforts to keep everything watertight, we did get a bit of a deluge that came in and flooded one of our bedrooms.

Thankfully it was one of the rooms that we hadn’t decorated since moving in (yes, we still have one) so it could have been a lot worse. Thankfully the rain stopped before we had to got to bed, and we didn’t have to spend all night emptying tubs of rain water.
And after that, the builder pressed on to get it watertight again, and get the roof finished.

Thankfully, that was the last winter storm we really had, which meant that we didn’t have to worry about any more delays (caused by the weather, at least).

This view reminds me that we really need to get on and put some velux windows installed in the attic so that we can enjoy that view again.

The end of one journey

And so, the next crucial step was finishing off the rooves, getting the tiles on, and the velux window in, so that we could have something that looked like a proper extension. And by mid-April, we were there.

There was no rush, but because the weather had finally stopped being miserable, we were even able get the windows in too.

Technically, by this point, the builders had already started some of the internal works, and you can read about that in part 2.

Phase I: Mould Begone (part i)

It’s been more than four years since any updates from us, but to be fair , that was 2019, and some rather big things happened after then, which put the breaks on a lot of people plans! But we’ve also been bad and not kept you all up-to-date with the things that have been going on. So here is a catch up!

During this time, we’ve had three new jobs between us, increased our Lego collection way too much, and been trying to get fit and lose some weight. All in between Zoom calls, episodes of Tiger King, and trying to dodge coronavirus. So to sum it up, we’ve not been very busy with any DIY for the last three years!

But it’s not been a complete waste, because in 2021 we decided to finally move ahead in some of our plans for the extension.

Whilst our funds were pretty close the the amounts we’d been quoted in the past, we’d seen enough epidoses of Grand Designs (and Homes under the Hammer), to know that in almost every case the costs and timescales always end up way more than originally expected. So we didn’t want to try and do it all and run out of money before the end.

But during one of the visits from a builder, it was mentioned about having the utility room stripped out, insulated and redecorated as part of the extension plans in order to get rid of the black mould, and make it all good. The builder gave us 2 quotes for both the new part of the extension, and the improvements to the utility room, and it was this that gave us the idea about splitting the works needed into the 2 parts that needed doing.

Over the previous six years of living in the house, the black mould in the utility room had crept further and further up the walls and bloomed in previously untouched areas. And when it rained heavily, the water would seep in around the door frame and though the holes in the roof, despite having had the roof professionally repaired a few years ago.

So we really wanted to try and sort this out once and for all, and we spoke with the architect to see if it could be done. Fortunately it could be, without having to change things very much.

The drains in the garden would need to be moved, which is something that we would need to do as part of the extension foundations anyway, so we decided to include the foundations as part of the work in this phase. And since we were doing the utility at a different time to the bathroom, we decided to add a shower into the utility as well. It’s something that we previously thought about doing, and we thought it would come in handy when the bathroom works will take place, and we won’t have a bath/shower.

This had the added benefit of being enough work for the council to accept the plan as being officially started, which meant that our planning permission wouldn’t expire, as well as having a new (mould free) utility room without having to pay the huge cost of both phases at once (which would have required a few more years of saving)!

There was another issue that splitting the work into phases also helped with, and that was inflation! This was in mid-2021, and so the world was beginning to open up again, and building supplies were struggling to keep up with demand, so the price of a lot of materials were increasing month after month. That meant that a quote given to us at this point might be considerably out of line with the final price we’d end up paying. So at least by only doing a part of all of the works, we’d be able to stop the possibility of inflation becoming a bigger problem for us (which as it turned out, was a very good thing).

We went through the normal (long) processes, with getting quotes from a few different builders and eventually works started in November 2021, and were due to finish around Christmas (although actually ended up finishing in April 2022, but we knew it would always take longer).

First jobs first – Out with the old

Before any works could begin, we had to try and clear out as much of the stuff in the utility as we could move, which was a lot more than we’d realised.

It’s amazing to see how much things have changed, now that we’re looking back.

Second Job – Foundations

Obviously starting in November meant that the builders were already going to have to face into a lovely English winter and its weather, but it was relatively mild, although I am still glad it wasn’t us out there every day in the mud.

One thing that the builders did request of us, was the need to knock down part of the back wall, to give access to some machinery to dig up the ground. By sheer luck, the wall in the back garden backs on to a road, that would allow the access, and we discovered that the wall acutally belonged to us too! And we think we happen to be the only house along our neighbours who happen to have our back garden back on to another road, so for the first time, it actually felt like we had a bit of good luck!

The machinery defineitly helped with the groundworks, and made quick work of it, even if it did effectively turned out garden into somehting that looked like it could be used in a WWI film set!

And becaue we now both work from home, we were actually around for almost all of the works, which meant that we were able to have a little play around with some time-lapse videos.

And eventually things started to come together, with soak-aways being added, and foundations being laid.

Even the new drains came together well, although I know it took many days of being sat in the rain to finish it off.

It felt pretty strange to actually see the foundations going in, when we’d spent so long talking about it.

And although we tried our very best, the nice smooth concrete surface did end up with a few cat paw prints in it!

The garden was left in ruins, but you can’t have everything!

See part 2 for the details on the Utility room!