Paradise garden (phase I)

in 2026, we were keen to see if we could make some progress in the back garden, rather than just continuing to use it as a bit or a storage place. So we took the designs we had and contacted a landscaper that our designer recommended.

Add on top that, the fact that the fence had been damaged and was looking pretty weary, we were still really keen to create a garden that we really wanted, which consisted of plenty of trees, planters to grow stuff and ideally no grass! It was a lot, so similar to the extension, we thought we’d try and break it down into phases, so that we could make some advancements.

The fence was the first thing to come down, and go back up. Although we did have to dismantle the composter to be able to do that, and thankfully there were no mice to jump out and scare me this time.

And then the we managed to get the wall fixed, so no more slipping down the muddy slope. Small steps, but great improvements.

Next was the structure for underneath the decking, and a slight change to the downpipe so that we could minimise any splashing. Plus we had to to put a bit of extra support over in this corner, ready for when a water butt will be put in. Luckily the issue we had with the kitchen drains was sorted out, just before the landscaper started, so that wasn’t a problem any more.

Another job was putting in a hardstanding, ready for when we get our garden room.

Unfortunately, all of this work ended up making the garden look like a builders site again. But especially when the opposite fence was taken down, and the old concrete posts removed. We found some very interesting materials that had been used to prop up the fence, including several car windows, some scaffolding, and a bullet.

Despite that, the landscapers managed to get all of the old junk out, and get the new fencing in. And at the same time, they had also been able to get the millboard decking down too.

Sell, Sell, Sell

After a quick tidy up, the landscapers were able to leave the garden in a much better state. But it did leave bunch of stuff in the garden that was our own. Stuff that was left over from when we moved in, like our raised planter. And stuff from both phases of the extension, like the old patio slabs, and spare tiles from the old and new roof.

I had, admittedly, put the job of getting rid of these items, off for a long time as it was going to be a complete nightmare lifting a lot of heavy objects into my tiny car and driving it around to the dump over and over again. And I knew it would cost me to get someone in to do it, or even hire a skip.
So I thought I’d give something else a try, and see if anyone would be interested in collecting them from us instead if they were free. I wasn’t 100% sure if people would be all that interested, but it wouldn’t cost anything to put them on marketplace and give it a try.

It turns out these were probably the most popular things I’ve ever listed, with endless people messaging to find out if they could come and take them. In less than a week, it was all gone, and for the first time we could actually see (almost) all of the lawn again. 100% would recommend.
And big concrete slabs don’t feel as heavy when you’re lifting them into someone else’s car for them to have to deal with.

I Want to Paint it Black

There was one job that the landscaper asked it we were okay doing ourselves, and that was painting. This wasn’t a problem as it was something we did a lot of anyway. All we needed was to get the paint and find a sunny day to do it on, and there was plenty of those to pick from in the summer of ’26.
Once again, my poor mathematical skills came to fruition and I initially calculated that we’d need 12 tins of the fence paint to get the whole thing painted. Fortunately, I checked the numbers a second time and realised that we’d actually only need 2. Much easier.

I think there are a few bits that need a touch up after it’s expanded in this summer’s heat, but we managed to do 2 coats in a single day, so we’re pretty happy wit that. All I need to do now is try and convince the neighbours to treat their side, or at least let us around to treat it.

On to phase 2.

A Design for Life

Now that the extension was done, one thing that was missing was the connection to the garden that sat just outside of it. Part of the problem was that there was a giant step down when you stepped out of the new back doors, followed by a step up to get on to the lawn. It was a hangover from where the old patio was and the fact that the extension left a slight gap before the garden actually started. Plus the little retaining wall that used to separate the patio and lawn had been fairly damaged from the previous phases of the extension.

It was a bit too soon to start any work, as we’d exhausted our savings to get the extension finished, but we thought it would be good to get something designed so that we could work towards something.

We found a lovely garden designer, who took our ideas and needs, and came up with a great design.

This design covered some essential needs from us.

Decking to create the flow between the house and the garden
Plenty of trees and shrubs to help help block out the neighbours that overlook our garden and gives some privacy, while also giving plenty of spaces for nature to come into the garden.
Paths to make it easy to get around the garden
A garden room, so we can be out in there and enjoy the garden when it’s done
Planters so we can continue to grow vegetables, which we’ve enjoyed doing over the past few years.
And no grass.

We think she did a pretty good job. So now we knew what kind of thing we wanted to work towards, we could get an idea of the cost, and so how much we’d need to save, and how long that might take. Suffice to say, it would take a while. But like the extension, we could start putting money towards it.

Phase I: Mould Begone (part i)

It’s been more than four years since any updates from us, but to be fair , that was 2019, and some rather big things happened after then, which put the breaks on a lot of people plans! But we’ve also been bad and not kept you all up-to-date with the things that have been going on. So here is a catch up!

During this time, we’ve had three new jobs between us, increased our Lego collection way too much, and been trying to get fit and lose some weight. All in between Zoom calls, episodes of Tiger King, and trying to dodge coronavirus. So to sum it up, we’ve not been very busy with any DIY for the last three years!

But it’s not been a complete waste, because in 2021 we decided to finally move ahead in some of our plans for the extension.

Whilst our funds were pretty close the the amounts we’d been quoted in the past, we’d seen enough epidoses of Grand Designs (and Homes under the Hammer), to know that in almost every case the costs and timescales always end up way more than originally expected. So we didn’t want to try and do it all and run out of money before the end.

But during one of the visits from a builder, it was mentioned about having the utility room stripped out, insulated and redecorated as part of the extension plans in order to get rid of the black mould, and make it all good. The builder gave us 2 quotes for both the new part of the extension, and the improvements to the utility room, and it was this that gave us the idea about splitting the works needed into the 2 parts that needed doing.

Over the previous six years of living in the house, the black mould in the utility room had crept further and further up the walls and bloomed in previously untouched areas. And when it rained heavily, the water would seep in around the door frame and though the holes in the roof, despite having had the roof professionally repaired a few years ago.

So we really wanted to try and sort this out once and for all, and we spoke with the architect to see if it could be done. Fortunately it could be, without having to change things very much.

The drains in the garden would need to be moved, which is something that we would need to do as part of the extension foundations anyway, so we decided to include the foundations as part of the work in this phase. And since we were doing the utility at a different time to the bathroom, we decided to add a shower into the utility as well. It’s something that we previously thought about doing, and we thought it would come in handy when the bathroom works will take place, and we won’t have a bath/shower.

This had the added benefit of being enough work for the council to accept the plan as being officially started, which meant that our planning permission wouldn’t expire, as well as having a new (mould free) utility room without having to pay the huge cost of both phases at once (which would have required a few more years of saving)!

There was another issue that splitting the work into phases also helped with, and that was inflation! This was in mid-2021, and so the world was beginning to open up again, and building supplies were struggling to keep up with demand, so the price of a lot of materials were increasing month after month. That meant that a quote given to us at this point might be considerably out of line with the final price we’d end up paying. So at least by only doing a part of all of the works, we’d be able to stop the possibility of inflation becoming a bigger problem for us (which as it turned out, was a very good thing).

We went through the normal (long) processes, with getting quotes from a few different builders and eventually works started in November 2021, and were due to finish around Christmas (although actually ended up finishing in April 2022, but we knew it would always take longer).

First jobs first – Out with the old

Before any works could begin, we had to try and clear out as much of the stuff in the utility as we could move, which was a lot more than we’d realised.

It’s amazing to see how much things have changed, now that we’re looking back.

Second Job – Foundations

Obviously starting in November meant that the builders were already going to have to face into a lovely English winter and its weather, but it was relatively mild, although I am still glad it wasn’t us out there every day in the mud.

One thing that the builders did request of us, was the need to knock down part of the back wall, to give access to some machinery to dig up the ground. By sheer luck, the wall in the back garden backs on to a road, that would allow the access, and we discovered that the wall acutally belonged to us too! And we think we happen to be the only house along our neighbours who happen to have our back garden back on to another road, so for the first time, it actually felt like we had a bit of good luck!

The machinery defineitly helped with the groundworks, and made quick work of it, even if it did effectively turned out garden into somehting that looked like it could be used in a WWI film set!

And becaue we now both work from home, we were actually around for almost all of the works, which meant that we were able to have a little play around with some time-lapse videos.

And eventually things started to come together, with soak-aways being added, and foundations being laid.

Even the new drains came together well, although I know it took many days of being sat in the rain to finish it off.

It felt pretty strange to actually see the foundations going in, when we’d spent so long talking about it.

And although we tried our very best, the nice smooth concrete surface did end up with a few cat paw prints in it!

The garden was left in ruins, but you can’t have everything!

See part 2 for the details on the Utility room!