Now that the external work had been done and we were properly sealed up (see part 1) work on the inside could begin.
Working 9-5
As exciting as it is for internal works to begin, this work meant that we couldn’t work from home any more because they would have to start drilling through to the exact spot where I worked, and they going to start making a lot of noise and mess.
So from mid-April, we had to get back in the routine of waking up earlier and heading in to the office again. Not a lot of fun, especially when we’d gotten used to working from home since lockdown, but there was no other choice.
It also meant that we were living in a building site, where we were surrounded by lots of junk that could no longer go where it was supposed to go, and absolutely everything was covered in brick dust. Brick dust that we still occasionally find, years later.



This bit got very tiring, very quickly.
Out with the old
First up was the bathroom. And this bathroom should have been removed a long time ago, but we were always waiting for this point, so that we didn’t end up replacing a bathroom twice.







With the toilet and shower gone, it was not looking good for us to stay in the house, but by sheer luck (not really cos we kind of planned it) we have another toilet and shower downstairs, that the builders had installed as part of the utility room improvements back in Phase 1.
It’s not ideal having to use the shower all the way downstairs, and going back to having one toilet, but we had actually been using the downstairs shower since it was installed, because it was so much better than the old electric one upstairs, so it wasn’t too much of a change.
And now that we’re looking at the inside work, all of the diagrams and documents that we got from the architect suddenly became incredibly useful. We had to tweak one or two of them after there had been a couple of changes, but nothing major.




Break on Through
Now it was time to get serious, with the bathroom completely gone, the builders could start knocking the old external walls down to join the old and new together. Even the kitchen had to be mostly removed too, but suddenly the space opened up and you could see just how much of a difference the extension was going to make.





And it was quite therapeutic seeing so much crap being thrown out, including an oven that was most likely older than either of us, which we also found out had been slowly scorching the wall behind the oven every time we, and possibly the previous occupiers, had used it.





It was even interesting to see other things that we wouldn’t normally get to see, like above the ceilings, or being able to see the new bathroom from the back bedroom. And in May, we finally got to see how the house originally looked with the door between the kitchen and the hallway re-instated.







Kitchenette
Whilst we had the toilet and shower to fall back on, we hadn’t had the opportunity to install a back up kitchen anywhere. This meant the builders had to provide us with a ‘Plan B’, which basically involved keeping the sink from the old kitchen. We’d managed to find a little bit of room for the microwave and an air fryer, but that was about it. Luckily our fridge had been situated in the dining room before the extension, because the kitchen was never big enough for it, and so we were able to leave that where it was.
But it was pretty basic, and you quickly get tired of having to brush your teeth in the middle of the kitchen, and living off of a lot of ready meals, every day. Although I did start making use of the Too Good To Go app over this period, which I usually enjoyed.






Despite it feeling like we were in something of a Groundhog Day, the builders were making some decent progress. Some of it felt pretty destructive, more than constructive, but it was all part of the process.








I Love it When a Plan Comes Together
By the end of May, we were starting to see some of the final parts coming together and yet more of the outside jobs were getting fished too, making it feel like we were really getting close.





If I am honest, this couldn’t come quickly enough. Between working at the office, the lack of kitchen, and having to spend almost every weekend, sourcing tiles, or trims, or paint colours, or cupboard handles, or grout, or flooring, or wood, it was getting to be a bit of a slog.
We even missed the northern lights, that were visible in August 2024 (extremely rare event for our part of the world), just because we knew we had to get up early the next morning and out to some suppliers.
But there was more progress with the underfloor heating installed, and flooring down. A brand new boiler, and even some tiles (which may have annoyed the builder a little bit because we picked the most awkward way to have them laid out), but we could almost see the finish line.





But that bathroom was getting a lot closer. With the tiling being completed, and the paint on the walls. We even had the radiators, and shower and bath plumbed in. The sink and toilet were no longer just theoretical, and we had power.





Then came a really big part of the jigsaw, the new kitchen, which was delivered in late June. Even before we were stuck with just a sink, the kitchen had always been one of those areas that caused us so many headaches. It was really the biggest driver for getting the extension in the first place, as there was just no way to make use of the space that was there. So it was a massive thing to finally see a new kitchen being built in our house.






We had a few issues with a missing oven, and then 2 being delivered at once, but it got sorted eventually. And it felt even more real when some of the finishing touches started going in, like the tiling, and a new sink (that isn’t just floating in the middle of the floor).
We still had the old sink while the new kitchen was going in as we didn’t have a fully completed bathroom just yet, but the builder knew this couldn’t stay, so they finished the bathroom off, and cleared everything out, so we could start making use of it while the rest of the work could keep going.





Side Quest
We found out about a little known issue when buying tiles from some suppliers, which is that if you want to return any excess tiles, you can’t just take them back to the shop that you bought them from, you have to return them to the factory. In Wales. Yourself. Between 09:30-12:00. And pay for the privilege!
So early one Saturday, at the end of July, we loaded up our particularly small car with the tiles we no longer needed, and took a drive to Monmouth. Luckily, it was a nice summer day, and we used it as an opportunity to visit Tintern Abbey, which we’d not heard of before but happened to drive past on the way, and we headed over to Bristol for some lunch at The Bank Tavern, and had some extremely delicious food.


We also had some issues with some lights, where we were not happy with the quality. Thankfully we didn’t have to return these ourselves, as they came from China. It was frustrating that we couldn’t get these anywhere else, so we had to settle on a different option.




Happy Endings
After a few too many weeks, and months, of not having a house we could actually use, and finding brick dust on every possible surface and in places dust shouldn’t be able to reach, we we able to start cleaning up and properly moving in to our lovely new home, around the end of August.








Despite the fact that it felt like a long time (7 months in total), I have now seen other projects going on nearby and it seems that this was actually quite quick. Maybe that was helped by the fact that some works were done in earlier phases, in which case I am really glad that we did it like that.