Wild Wild West

2026 started off with a low note. We had a beautiful New Year’s Day, followed by several weeks of non-stop rain, including a few named storms. And one of those storms, called Chandra, hit on the 26th Jan.
And after seeing rain constantly all day and all night, we woke up to find some damp patches on one of the walls, so apparently there was a leak somewhere.

The patches were a bit random, so we couldn’t be sure where that leak was coming from. There was nothing obvious outside, like any missing roof tiles, but there was plenty of evidence of how extreme the weather had been. And the attic did show evidence that the leak may have been going on for a while.

And more importantly, the leak also found it’s way down to the newly built pantry. The timing was actually pretty lousy (or lucky, depending on your philosophical outlook) because we had just been to the local carpenter, in readiness to order some wood to build our pantry shelving. And the day before this happened, I’d received the confirmation email, with a link to pay for it. So obviously that particular job had to take a short break until later in the year.

Eventually the constant downpours did subside and the patches stopped expanding, and even dried out. What was left were patches of peeling paint and stained paint.
We decided it was best to give these some time to really dry out before looking to fix the patches, but in the meantime we’d contact some roofers to see if they can come out and figure out what’s wrong. Unfortunately, following a very storming few months, roofers were in high demand, so even trying to get hold of one turned out to be a tall ask. After a few weeks we hadn’t heard back from anyone.
Luckily for us, our neighbours directly opposite, were having some work done to a small bit of roofing, and so I contacted the number on their van to see if they were able to come and have a look while they were in the area. And they thankfully obliged.

Mind the Gap

The roofer popped over (after he’d finished his actual job) and pulled out an extremely long ladder, so he could get up and have a look for any damage. As expected, there wasn’t anything significant, but there were a log of small gaps in the old mortar, that rain could easily makes it’s way into. Especially if that rain was constant for a long period of time.

Fortunately that also meant that for just a few hundred quid, he could come and fill in those gaps, waterproof the area, and add a cowl, to minimise any future of water ingress. And after a few weeks, the scaffolding was erected, and then a few weeks after that they came and did the repairs.

This was also at the same time the landscapers started working on the back garden, and the same time as discovering that there was a problem with the new kitchen drains.

Ignoring those other job, all we needed to do now, was to sort out the peeling paint inside.

Climate Breakdown to the Rescue

We had to be sure that everything was dried out before we could try and repair anything at all, so we were hoping that once spring was out of the way, we’d get a nice spell of warm and dry weather to make sure everything was back to normal.
And the weather delivered! Summer 2026 turned out to be the hottest on record. So after the 5th heatwave, and experiencing twenty one consecutive days of maximum temperatures 25°C and higher, the house had been properly baked in the summer sun, and we thought it was probably a good time to finally repair the paint.

We also decided that if we were going to have to repaint the hallway and stairs, that we might also go for a new colour too. We originally just did a pure brilliant white, to make things easy. But first we needed to scrape of the paint that was flaking and peeling.

This didn’t seem too bad, but it was one of those jobs where you start peeling and suddenly a lot more comes off than you were expecting, and then as you try and make sure you’ve got every loose bit, the scraper gets another part and peels off yet more.
Undeterred by this, we were keen to get every last bit of loose paint off. And we then treated it with some Zinsser Peel Stop, to try and make sure there was no chance of any more coming off.

It did technically work, but as we went over a couple of patches with the new paint and a roller, it did manage to lift some more flakes off. But these were all areas that we hadn’t scraped beforehand, so the Peel Stop did it’s job, these were areas we hadn’t been treated, because we couldn’t see that they were there. So a second round of scraping, treating, and painting, did the trick.

And luckily the new paint even managed to make the walls look a bit more smooth and even too, so we’re happy with. Let’s see what Winter 26/27 has in store for us.

Paradise garden (phase I)

in 2026, we were keen to see if we could make some progress in the back garden, rather than just continuing to use it as a bit or a storage place. So we took the designs we had and contacted a landscaper that our designer recommended.

Add on top that, the fact that the fence had been damaged and was looking pretty weary, we were still really keen to create a garden that we really wanted, which consisted of plenty of trees, planters to grow stuff and ideally no grass! It was a lot, so similar to the extension, we thought we’d try and break it down into phases, so that we could make some advancements.

The fence was the first thing to come down, and go back up. Although we did have to dismantle the composter to be able to do that, and thankfully there were no mice to jump out and scare me this time.

And then the we managed to get the wall fixed, so no more slipping down the muddy slope. Small steps, but great improvements.

Next was the structure for underneath the decking, and a slight change to the downpipe so that we could minimise any splashing. Plus we had to to put a bit of extra support over in this corner, ready for when a water butt will be put in. Luckily the issue we had with the kitchen drains was sorted out, just before the landscaper started, so that wasn’t a problem any more.

Another job was putting in a hardstanding, ready for when we get our garden room.

Unfortunately, all of this work ended up making the garden look like a builders site again. But especially when the opposite fence was taken down, and the old concrete posts removed. We found some very interesting materials that had been used to prop up the fence, including several car windows, some scaffolding, and a bullet.

Despite that, the landscapers managed to get all of the old junk out, and get the new fencing in. And at the same time, they had also been able to get the millboard decking down too.

Sell, Sell, Sell

After a quick tidy up, the landscapers were able to leave the garden in a much better state. But it did leave bunch of stuff in the garden that was our own. Stuff that was left over from when we moved in, like our raised planter. And stuff from both phases of the extension, like the old patio slabs, and spare tiles from the old and new roof.

I had, admittedly, put the job of getting rid of these items, off for a long time as it was going to be a complete nightmare lifting a lot of heavy objects into my tiny car and driving it around to the dump over and over again. And I knew it would cost me to get someone in to do it, or even hire a skip.
So I thought I’d give something else a try, and see if anyone would be interested in collecting them from us instead if they were free. I wasn’t 100% sure if people would be all that interested, but it wouldn’t cost anything to put them on marketplace and give it a try.

It turns out these were probably the most popular things I’ve ever listed, with endless people messaging to find out if they could come and take them. In less than a week, it was all gone, and for the first time we could actually see (almost) all of the lawn again. 100% would recommend.
And big concrete slabs don’t feel as heavy when you’re lifting them into someone else’s car for them to have to deal with.

I Want to Paint it Black

There was one job that the landscaper asked it we were okay doing ourselves, and that was painting. This wasn’t a problem as it was something we did a lot of anyway. All we needed was to get the paint and find a sunny day to do it on, and there was plenty of those to pick from in the summer of ’26.
Once again, my poor mathematical skills came to fruition and I initially calculated that we’d need 12 tins of the fence paint to get the whole thing painted. Fortunately, I checked the numbers a second time and realised that we’d actually only need 2. Much easier.

I think there are a few bits that need a touch up after it’s expanded in this summer’s heat, but we managed to do 2 coats in a single day, so we’re pretty happy wit that. All I need to do now is try and convince the neighbours to treat their side, or at least let us around to treat it.

On to phase 2.

Phase 2: Can the Real Extension Please Stand up? (part ii)

Now that the external work had been done and we were properly sealed up (see part 1) work on the inside could begin.

Working 9-5

As exciting as it is for internal works to begin, this work meant that we couldn’t work from home any more because they would have to start drilling through to the exact spot where I worked, and they going to start making a lot of noise and mess.
So from mid-April, we had to get back in the routine of waking up earlier and heading in to the office again. Not a lot of fun, especially when we’d gotten used to working from home since lockdown, but there was no other choice.

It also meant that we were living in a building site, where we were surrounded by lots of junk that could no longer go where it was supposed to go, and absolutely everything was covered in brick dust. Brick dust that we still occasionally find, years later.

This bit got very tiring, very quickly.

Out with the old

First up was the bathroom. And this bathroom should have been removed a long time ago, but we were always waiting for this point, so that we didn’t end up replacing a bathroom twice.

With the toilet and shower gone, it was not looking good for us to stay in the house, but by sheer luck (not really cos we kind of planned it) we have another toilet and shower downstairs, that the builders had installed as part of the utility room improvements back in Phase 1.
It’s not ideal having to use the shower all the way downstairs, and going back to having one toilet, but we had actually been using the downstairs shower since it was installed, because it was so much better than the old electric one upstairs, so it wasn’t too much of a change.

And now that we’re looking at the inside work, all of the diagrams and documents that we got from the architect suddenly became incredibly useful. We had to tweak one or two of them after there had been a couple of changes, but nothing major.

Break on Through

Now it was time to get serious, with the bathroom completely gone, the builders could start knocking the old external walls down to join the old and new together. Even the kitchen had to be mostly removed too, but suddenly the space opened up and you could see just how much of a difference the extension was going to make.

And it was quite therapeutic seeing so much crap being thrown out, including an oven that was most likely older than either of us, which we also found out had been slowly scorching the wall behind the oven every time we, and possibly the previous occupiers, had used it.

It was even interesting to see other things that we wouldn’t normally get to see, like above the ceilings, or being able to see the new bathroom from the back bedroom. And in May, we finally got to see how the house originally looked with the door between the kitchen and the hallway re-instated.

Kitchenette

Whilst we had the toilet and shower to fall back on, we hadn’t had the opportunity to install a back up kitchen anywhere. This meant the builders had to provide us with a ‘Plan B’, which basically involved keeping the sink from the old kitchen. We’d managed to find a little bit of room for the microwave and an air fryer, but that was about it. Luckily our fridge had been situated in the dining room before the extension, because the kitchen was never big enough for it, and so we were able to leave that where it was.
But it was pretty basic, and you quickly get tired of having to brush your teeth in the middle of the kitchen, and living off of a lot of ready meals, every day. Although I did start making use of the Too Good To Go app over this period, which I usually enjoyed.

Despite it feeling like we were in something of a Groundhog Day, the builders were making some decent progress. Some of it felt pretty destructive, more than constructive, but it was all part of the process.

I Love it When a Plan Comes Together

By the end of May, we were starting to see some of the final parts coming together and yet more of the outside jobs were getting fished too, making it feel like we were really getting close.

If I am honest, this couldn’t come quickly enough. Between working at the office, the lack of kitchen, and having to spend almost every weekend, sourcing tiles, or trims, or paint colours, or cupboard handles, or grout, or flooring, or wood, it was getting to be a bit of a slog.
We even missed the northern lights, that were visible in August 2024 (extremely rare event for our part of the world), just because we knew we had to get up early the next morning and out to some suppliers.

But there was more progress with the underfloor heating installed, and flooring down. A brand new boiler, and even some tiles (which may have annoyed the builder a little bit because we picked the most awkward way to have them laid out), but we could almost see the finish line.

But that bathroom was getting a lot closer. With the tiling being completed, and the paint on the walls. We even had the radiators, and shower and bath plumbed in. The sink and toilet were no longer just theoretical, and we had power.

Then came a really big part of the jigsaw, the new kitchen, which was delivered in late June. Even before we were stuck with just a sink, the kitchen had always been one of those areas that caused us so many headaches. It was really the biggest driver for getting the extension in the first place, as there was just no way to make use of the space that was there. So it was a massive thing to finally see a new kitchen being built in our house.

We had a few issues with a missing oven, and then 2 being delivered at once, but it got sorted eventually. And it felt even more real when some of the finishing touches started going in, like the tiling, and a new sink (that isn’t just floating in the middle of the floor).

We still had the old sink while the new kitchen was going in as we didn’t have a fully completed bathroom just yet, but the builder knew this couldn’t stay, so they finished the bathroom off, and cleared everything out, so we could start making use of it while the rest of the work could keep going.

Side Quest

We found out about a little known issue when buying tiles from some suppliers, which is that if you want to return any excess tiles, you can’t just take them back to the shop that you bought them from, you have to return them to the factory. In Wales. Yourself. Between 09:30-12:00. And pay for the privilege!
So early one Saturday, at the end of July, we loaded up our particularly small car with the tiles we no longer needed, and took a drive to Monmouth. Luckily, it was a nice summer day, and we used it as an opportunity to visit Tintern Abbey, which we’d not heard of before but happened to drive past on the way, and we headed over to Bristol for some lunch at The Bank Tavern, and had some extremely delicious food.

We also had some issues with some lights, where we were not happy with the quality. Thankfully we didn’t have to return these ourselves, as they came from China. It was frustrating that we couldn’t get these anywhere else, so we had to settle on a different option.

Happy Endings

After a few too many weeks, and months, of not having a house we could actually use, and finding brick dust on every possible surface and in places dust shouldn’t be able to reach, we we able to start cleaning up and properly moving in to our lovely new home, around the end of August.

Despite the fact that it felt like a long time (7 months in total), I have now seen other projects going on nearby and it seems that this was actually quite quick. Maybe that was helped by the fact that some works were done in earlier phases, in which case I am really glad that we did it like that.