I Just Can’t Wait

Despite having done the first phase of the extension, and needing to save money for the next phase, we had an itch that needed to be scratched!

The hallway/stairs/landing was something that we hadn’t really touched since moving in. It was pretty dated, with more woodchip wallpaper, and some pretty old carpet. And annoyingly, the bannisters were all boarded up, which made everything much darker than it needed to be.

There were just lots of little jobs that needed doing. Holes that needed filing, bits that hadn’t been painted, and gaps that were still hanging around. All made worse by the fact that becasue we use it all of time. You get used to it, but when you start noticing it, and notice it several times a day, it gets a bit annoying! And partly because we were inspired by the transformation in the utility room, we were motivated to do something.

The other big driver to do this make over was that whilst Phase I had been going on, we had to move Charlie’s litter tray to the hallway. Unfortunately, Charlie wasn’t overly happy with this, and occassionally forgot where the litter tray was, and left some stains on the carpet. Despite cleaning up, scrubbing, and even wet vacuuming, the age of the carpet and the continued abuse meant that there was an underlying odour that wouldn’t go away.

Lies, Lies, Lies

One thing that we thought would be easy, was the bannisters and the removal of the boards that were covering the spindles. A number of people(admittedly non-professionals) were convinced that there would be lovely sindles hidden underneath the boards, and it will just be a case of revealing them, and painting them up. As you can probably already guess, this was not the case. There was not a spindle in sight. There was nothing my large bits of wood with nails sticking out in all sorts of directions, and unbelievably thick plaster board.

So this meant we were going to have to get a bit of professional help. But the aim was still to do as much of it ourselves as we could.

As we tackled the wallpaper, we quickly realised that the quality of the plastering wasn’t great either. But as plastering the walls would be expensive, we had to try our best at patching up the walls where it was needed.

A lot of this work was done after our day jobs, so it involved late nights, and not a lot could get done, so there was a lot of patching one day, sanding down the next, then a bit more patching, then more sanding. This felt like a never-ending cycle for a long, long time, but we did eventually make progress.

Doing What We Can

And slowly but surely, we made advances, and stripped the old varnish off, sanded down raw wood, primed the new spindles, and everything else that needed to be done so the carpenter could come in and update the stairs.

And we were glad to have the carpenter come in and sort the bannister, as it was definitely not something you could afford to get wrong.

Unfortunately, our cat took a little too much interest in all of the on-goings and decided to explore, and mark some of the new woodwork. It’s not easy to get that out of newly installed wood, especially when it’s in the most awkward of places to get to. From that point, we closed the door so that Charlie couldn’t get out there again.

A Cunning Plan

Once that was done though, we could start on the next professional jobs, which involved installing the new door under the stairs, and plastering around that, as well as installing a new floor. Both things we’d been in need of for a long time, and we had clear ideas of exactly what we wanted.

Despite those ideas, my tape measuring skills were obviously quite poor as I managed to mess that up and calculated the wrong floor area and didn’t order enough tiles. Thankfully as soon as the builder turned up, he took one look at the tiles and the floor and spotted that we didn’t have enough, so we quickly got back on with the supplier and ordered some more. Thankfully we’d ordered from a fairly local company (after being messed around by another company) and were able to get enough in while the builder levelled the floor.

One other thing that needed doing was filling in the gaps that were around all of the windows. This is something that all of the windows in the house have had. It’s just one of the oddities from when it was built. We’d had some of these sorted before, and just needed the ones on the stairs to be done as well (and the door, but we’ll come back to that). Seemed like a simple enough job, but the builders this time took a different approach this time, using expanding foam, rather than plaster board. It all seemed to be fine, but at the end, when these areas had been plastered, it was impossible to get a flat finish. And even years later, I can still see all of the small bumps, and I will definitely make sure that when the final window is done, we get the builder to use the plasterboard method.

I’m Dreaming of a (Black and) White Christmas

Despite that, we were able to crack on and take up the old carpet completely, paint the skirting boards, bannisters and walls, before the floor tiles and carpet were installed.

And once again, we were doing the painting between work, so there were a lot of evenings and weekend painting the walls white, then painting the skirting black. And because I kept getting the black paint on the white, and the white paint on the black, I had to go back over this many, many times. Thankfully we had some extra days off over Christmas, so we were able to get a few more days work in.

Herring in a Different Direction

And once that was done, we could finally let the builder loose and start getting the tiles down. We opted for a herringbone pattern, and despite some builders telling us it was not possible, the guy that did it, made it look like an absolute breeze! We know for a fact that it wasn’t, but the guy was obviously a professional.

So, you can probably guess that we were really happy with the final result. Not only did it look good, but it was hard-wearing, and having had years of tramping in mud and rain onto a very old carpet, it was amazing to have a floor that was actually useful.

And with the tiles being done, that meant that the carpet could go down, and we could finish off the little jobs.

And before you knew it (not really, cos it actually took a few months from start to finish) we had a much better looking hallway, and stairs.

And it really did make a massive difference. Because it’s the first room you see when you come in to the house, it really felt different coming in to something that was clean, light, and welcoming, compared the dark and dated version that it was before.

One Final Mistake

We even let Charlie have a little explore, now that all of the mess and scary workmen had gone, in the hope that he would feel a lot more comfortable in the space again.

Uncomfortably he took the opportunity to pee on the new rug, and the newly laid carpet, and so we decided that it was best for Charlie to not use this space unsupervised any more. (And shout out to Argos for their same-day delivery of a wet-vac that allowed us to clear up the mess.)

Living on a Prayer – part 2

[Check out part 1, if you haven’t read it already.]

The plumber came first on 19th February 2018 and installed three radiators (Hallway, living room and dining room). He also advised us that our boiler is at least 18 years old (because apparently from 2000 all boilers sold had to be condenser boilers – and ours is not that ) and that we are doing well for it to still be working.  (Admittedly it’s a bit temperamental – but his comment has allowed us to prioritise the new boiler to be one of the next jobs).

[Aside – As we want our new boiler to be located in the attic, rather than wasting our valuable kitchen space, this is due to be an expensive job.  I would rather, however, have this job prioritised and spend the money on doing it at our convenience then having it unexpectedly break and either have a new boiler quickly installed without having it moved, or having one installed and us going without hot water in the meantime.]

He was quick and got all the old radiators off and the new ones on (and copper piping done) in a day, which was handy.

We weren’t sure what order things were going to be done in, but we knew that as well as the radiator/plumbing, we had the plasterer coming and a carpenter to do the window sill, and someone to swap the door around, so we tried to get everything ready. And by chance on the same day as the plumber (and at almost the exact same time) a Virgin Media engineer turned up to move the cable entry point. It was a silly little job,  but it meant that we didn’t have leads trailing all over the place, and it made sense to get it done before the plasterer turned up.

One thing were very glad to see the back of was the old window sill. This had rotted and had some weird growth beneath it. We think that at some point there must have been a leak and the wood slowly rotted away. And the attmept to fix this was some to leave it an cover the mould with some decorators caulk.

The plasterer came over just a few days later, again fortunately when we were both off and were attending a cookery course over at River Cottage, so we were able to get everything ready but also didn’t have to sit in the house whilst the work was going on.

Note the Wifi Router protected but in place

Impatient

The plastering was actually one of our biggest problems. Whilst 95% of it was fine, we had a few problems with the rest of it. The problem areas were all of the difficult parts, like around the sockets, pipes, and floor. There were sections that had just been missed around the copper piping, that we had to fill in ourselves, and gaps around the skirting, which although would eventually be covered by the skirting boards, were so uneven that we’d spend many hours trying to make it fit for purpose.

Please mind the gap

All white

Then it snowed.

After that, we got back to painting and decorating.

Starting to come together

Kate’s idea of decorating

But my skills aren’t much better

Although our calculations on the paint were pretty damn accurate

Oh yeah, then it snowed again.

I must admit that writing this makes it seem like as soon as the plaster went on, we got everything painted. But in reality this took fucking ages. For weeks, it was was a case of waking up, going to work, coming home, painting, sleeping, and repeat. It was quite soul destroying.

But eventually, we got there. And in the process we did learn a few thing about decorating, that we put together in a quick guide.

Then we had the carpenter come to put the new window sill in. Some time last year we purchased a load of oak sills ready to go into the windows as and when they were ready. Again, we were keen to see this, having had such horrible sills there before. After about 15 minutes of the carpenter being there, he did notice that the wood we had wasn’t actually going to fit in the window properly. Basically, I had fucked up the measurements and not thought things through properly. But in contrast to the plasterer, the carpenter was fantastic, and was actually able to fix my mistake by using a couple of the other sills that we hadn’t used yet and did a fantastic job.

Although once he had installed the sill, we quickly realsied that the plasterer hadn’t quite been able to plater right up to the edge, so there were some more gaps that we had to fill in.

Now the room was starting to feel like it was nearly there. One last thing (or so we thought), and that was the flooring. Originally we were going to carpet the front room, and have some hard flooring in the dining room, but we wanted to keep the costs down and get things done as soon as we could. We popped over to our local carpet shop (literally around the corner) several times, as we kept trying to get some samples, and eventually got some to try.

We were sensible compared to last time and when for a reasonably priced option that would be quite hard waring.

One problem though; the manufacturers didn’t have any in stock so we had to wait a few extra weeks. As it turns out that would be a good thing.

The last job to do, was the skirting.  I was not looking forward to it, but I watched some YouTube videos to see how people did it, and we bought a proper mitre saw (having realised it was cheaper to buy one than rent one for a few days). However, things didn’t go as easily as planned. Despite following the instructions and having faith in trigonometry, the wood didn’t slide together as easily as I had hoped. And thanks to the plasterer, every wall had to have chunks of plaster taken off and sanded down so that the walls were even and straight (or as straight as we could make them).

Even after all of this, the skirting was pretty uneven and a bit of a mess. We hoped that after a bit of sanding and filling, it might be a bit better, but even this was a struggle. I don’t think I even took any photos of the skirting, as I was too stressed trying to get it done. And it took a hell of a lot longer than we’d expected too, so the delayed carpet turned out to be handy. In the last weekend before the carpet fitting, we even got Kate’s parents to come over and help finish of last few jobs, like caulk, sockets, and filling, to try and get everything finished.

After several attempts with the filler, a lot of sanding and several coats of paint, things started to look a bit more normal. All we had to do was remove the frog tape we placed around the skirting to protect the paint on the walls. How bad could that be?

As it turns out, this was not a simple job. And it meant that we had to go back over almost every inch of the wall that had been covered in the tape. And whilst this didn’t take long, we only had 2 days before the carpet was due to be fitted, so had to use all the spare time we had to get it done.
We’re not sure why this happened, or what we should have done to prevent it because we even bough specific ‘low-tack’ tape but it made absolutely no difference.

Thankfully we managed to get those bits covered just in time before the carpet fitters arrived.

The wood underneath was actually in not bad shape, and we could have used it. Maybe next time.

Random Holes

Standing by

The carpet fitting took hardly any time at all and for the first time in a long time, the room looked like it was ready to live in.

Time to finish it off…[see part 3]