Despite having done the first phase of the extension, and needing to save money for the next phase, we had an itch that needed to be scratched!
The hallway/stairs/landing was something that we hadn’t really touched since moving in. It was pretty dated, with more woodchip wallpaper, and some pretty old carpet. And annoyingly, the bannisters were all boarded up, which made everything much darker than it needed to be.






There were just lots of little jobs that needed doing. Holes that needed filing, bits that hadn’t been painted, and gaps that were still hanging around. All made worse by the fact that becasue we use it all of time. You get used to it, but when you start noticing it, and notice it several times a day, it gets a bit annoying! And partly because we were inspired by the transformation in the utility room, we were motivated to do something.
The other big driver to do this make over was that whilst Phase I had been going on, we had to move Charlie’s litter tray to the hallway. Unfortunately, Charlie wasn’t overly happy with this, and occassionally forgot where the litter tray was, and left some stains on the carpet. Despite cleaning up, scrubbing, and even wet vacuuming, the age of the carpet and the continued abuse meant that there was an underlying odour that wouldn’t go away.
Lies, Lies, Lies
One thing that we thought would be easy, was the bannisters and the removal of the boards that were covering the spindles. A number of people(admittedly non-professionals) were convinced that there would be lovely sindles hidden underneath the boards, and it will just be a case of revealing them, and painting them up. As you can probably already guess, this was not the case. There was not a spindle in sight. There was nothing my large bits of wood with nails sticking out in all sorts of directions, and unbelievably thick plaster board.



So this meant we were going to have to get a bit of professional help. But the aim was still to do as much of it ourselves as we could.
As we tackled the wallpaper, we quickly realised that the quality of the plastering wasn’t great either. But as plastering the walls would be expensive, we had to try our best at patching up the walls where it was needed.



A lot of this work was done after our day jobs, so it involved late nights, and not a lot could get done, so there was a lot of patching one day, sanding down the next, then a bit more patching, then more sanding. This felt like a never-ending cycle for a long, long time, but we did eventually make progress.
Doing What We Can
And slowly but surely, we made advances, and stripped the old varnish off, sanded down raw wood, primed the new spindles, and everything else that needed to be done so the carpenter could come in and update the stairs.



And we were glad to have the carpenter come in and sort the bannister, as it was definitely not something you could afford to get wrong.



Unfortunately, our cat took a little too much interest in all of the on-goings and decided to explore, and mark some of the new woodwork. It’s not easy to get that out of newly installed wood, especially when it’s in the most awkward of places to get to. From that point, we closed the door so that Charlie couldn’t get out there again.
A Cunning Plan
Once that was done though, we could start on the next professional jobs, which involved installing the new door under the stairs, and plastering around that, as well as installing a new floor. Both things we’d been in need of for a long time, and we had clear ideas of exactly what we wanted.






Despite those ideas, my tape measuring skills were obviously quite poor as I managed to mess that up and calculated the wrong floor area and didn’t order enough tiles. Thankfully as soon as the builder turned up, he took one look at the tiles and the floor and spotted that we didn’t have enough, so we quickly got back on with the supplier and ordered some more. Thankfully we’d ordered from a fairly local company (after being messed around by another company) and were able to get enough in while the builder levelled the floor.



One other thing that needed doing was filling in the gaps that were around all of the windows. This is something that all of the windows in the house have had. It’s just one of the oddities from when it was built. We’d had some of these sorted before, and just needed the ones on the stairs to be done as well (and the door, but we’ll come back to that). Seemed like a simple enough job, but the builders this time took a different approach this time, using expanding foam, rather than plaster board. It all seemed to be fine, but at the end, when these areas had been plastered, it was impossible to get a flat finish. And even years later, I can still see all of the small bumps, and I will definitely make sure that when the final window is done, we get the builder to use the plasterboard method.
I’m Dreaming of a (Black and) White Christmas
Despite that, we were able to crack on and take up the old carpet completely, paint the skirting boards, bannisters and walls, before the floor tiles and carpet were installed.






And once again, we were doing the painting between work, so there were a lot of evenings and weekend painting the walls white, then painting the skirting black. And because I kept getting the black paint on the white, and the white paint on the black, I had to go back over this many, many times. Thankfully we had some extra days off over Christmas, so we were able to get a few more days work in.
Herring in a Different Direction
And once that was done, we could finally let the builder loose and start getting the tiles down. We opted for a herringbone pattern, and despite some builders telling us it was not possible, the guy that did it, made it look like an absolute breeze! We know for a fact that it wasn’t, but the guy was obviously a professional.



So, you can probably guess that we were really happy with the final result. Not only did it look good, but it was hard-wearing, and having had years of tramping in mud and rain onto a very old carpet, it was amazing to have a floor that was actually useful.





And with the tiles being done, that meant that the carpet could go down, and we could finish off the little jobs.




And before you knew it (not really, cos it actually took a few months from start to finish) we had a much better looking hallway, and stairs.

And it really did make a massive difference. Because it’s the first room you see when you come in to the house, it really felt different coming in to something that was clean, light, and welcoming, compared the dark and dated version that it was before.
One Final Mistake
We even let Charlie have a little explore, now that all of the mess and scary workmen had gone, in the hope that he would feel a lot more comfortable in the space again.


Uncomfortably he took the opportunity to pee on the new rug, and the newly laid carpet, and so we decided that it was best for Charlie to not use this space unsupervised any more. (And shout out to Argos for their same-day delivery of a wet-vac that allowed us to clear up the mess.)